Show the proposed equipment position
Photograph the existing inverter, meter area and possible battery position safely from ground level. Note doors, windows, walkways or other constraints nearby. PSA needs to check the proposed installation location and the selected manufacturer's requirements; a product picture alone cannot establish suitability.
